欧美日韩在线视频一区_国产日韩精品欧美一区灰灰_九九在线观看精品视频6_成人黄色在线免费观看_直接在线观看的三级网址_欧美一区二区三区高清不卡tv_手机看片1024福利_精品国产三级a∨在线观看_亚洲人成影院午夜网站

LST-WP1 description

Short description:

Please read this manual carefully before using this machine, and keep it in a safe place for future reference.


Advantage

application

LST-WP1 roof hot air welding machine has advanced heating technology and high welding pressure. With powerful functions, stable performance and convenient operation, it is suitable for the construction of polymer waterproof membranes such as PVC, TPO, EPDM, CPE, etc.

Precautions

The main components

Precautions1

Before disassembling the welding machine, please make sure that the machine is turned off and unplug it to avoid being injured by the live wires or parts inside the machine.

Precautions2

The welding machine generates high temperature and high heat. Improper use may cause fire or explosion, especially when it is near combustibles or explosive gases.

Precautions3

Please do not touch the air duct and nozzle (during the welding process or when the welding machine has not completely cooled down), and do not face the nozzle to avoid burns.

Precautions4

The power supply voltage must match the rated voltage (230V) marked on the welding machine and be grounded reliably. Connect the welding machine to a socket with a protective ground wire.

Precautions05

In order to ensure the safety of the operators and the reliable operation of the equipment, the power supply at the construction site must be equipped with a stabilized power supply and a leakage protector.

Precautions6

The welding machine must be operated under the correct control of the operator, otherwise it will cause burning or explosion due to high temperature

Precautions7

It is strictly forbidden to use the welder in water or on muddy ground to avoid immersion, rain or moisture.

Precautions9

control Panel

Positioning before welding

Precautions10

1. Welding temperature:

Use bottomPrecautions11Precaution 11 Set the required temperature. You can set the temperature according to the welding material and the ambient temperature. The LCD screen will display the set temperature and the current temperature.

2. Welding speed:

According to the soldering temperature, use the bottomPrecautions12Precaution 12 set the desired speed.

The LCD display will show the set speed and current speed.

● This machine has a parameter memory function, that is, when the welding machine is used next time, the welding machine will automatically use the parameters set last time without resetting the parameters.

Precautions13

1. Press the handle to lift the machine and move it to the welding position (the edge of the upper film should be aligned with the driving roller), as shown in Figure 4.

2. Lift the guide rod to make the front wheel (left) off the ground, slide the handle of the guide wheel to the right, until the guide wheel limit slot plate is in the correct position, so that the guide wheel is aligned with the edge of the upper film.

Welding Nozzle Setting

Nameplate

Precautions14

The model identification and serial number identification are marked on the nameplate of the selected machine.

Please provide these data when consulting Lesite Sales and Service Center.

Precautions15
error code Description Measures
Error T002 No thermocouple detected a. Check the thermocouple connection, b. Replace the thermocouple
Error S002 No heating element detected a. Check the heating element connection, b. Replace the heating element
Error S002 Thermocouple operation failure a. Check the thermocouple connection, b. Replace the thermocouple
Error Fanerr overheat a. Check the hot air blower, clean the nozzle and filter

Boot Steps

Daily Maintenance

Precautions16

① Turn on, the LCD screen is as shown in the figure above. At this time, the fan does not generate heat and is in a state of natural blowing.

Precautions17

② Press the temperature rise (32) and temperature drop (33) buttons at the same time. At this time, the blower begins to heat to the set temperature.

When the current temperature reaches the set temperature, press the speed button.

Ascend (34) to set the speed. The LCD screen is shown in the picture above.

Precautions18

③ Pull up the blower positioning handle (30), raise the hot blower (8), lower the welding nozzle (3) to make it close to the lower film, move the blower to the left, insert the welding nozzle into the film, and perform welding

The nozzle is in place, and at this time, the welding machine travels automatically for welding.

The LCD screen is shown in the picture above.

④ Always pay attention to the position of the guide wheel (21). If the position is deviated, you can touch the operating handle (25) to adjust.

Shutdown steps

After the welding work is completed, remove the welding tip and return to the initial position, and at the same time press the temperature rise (32) and temperature drop (33) buttons on the control panel to turn off the heating. at this time,

The hot air blower stops heating and is in cold air standby state. After the temperature drops to 60°C, allow the welding gun to cool down to °C, and then turn off the power switch.

Precautions19

  • Previous:
  • next:

  • Write your message here and send it to us